Our estimate: the homes pay about $400 each a year toward roads. That covers upkeep and repaving, but rebuilding the streets at end of life would cost 1.3 to 2.7 times that. Over 50 years, a gap of roughly $1.6 to $7.7 million.
See the long-term cost
$1.6 million to $7.7 million short over 50 years
What the streets really cost, counting the rebuildWhat the homes pay toward roads
The homes pay about $400 each a year toward roads. That buys upkeep and repaving, not the rebuild.
When the streets wear out, the shortfall lands on everyone else in the township: a new levy, or other roads that wait longer.
The township said in 2018 it could only afford to repave its roads about every 39 years. This adds about 2.7 more miles to that list.
Sewer: every home pays the same county rate, so any extra cost to run and replace its pump station is spread onto every customer. How much? Unknown until the county releases the station's real costs.
Ohio EPA, the Attorney General, U.S. EPA Region 5 and the county commissioners were sent the violation record, the 1989 history and the plan gaps in one message. Waiting for answers.
Clermont County: 1 drinking water loan request on Ohio EPA's 2027 list, 0 of them repairs
Of $2,000,000 in requested state drinking water loans on Ohio EPA's 2027 intended projects list, $0 is for repairs, $0 for new or expanded capacity and $2,000,000 for projects whose names don't say which. The largest is New Richmond's "New Richmond Water System Improvements" at $2,000,000.
Clermont County: 8 state public works projects for fiscal 2027, 6 of them repairs
Of $5,917,742 in Ohio Public Works Commission money approved for fiscal 2027, $4,595,936 is for repairs, $744,479 for new or expanded capacity and $577,327 for projects whose names don't say which. The largest is Clermont County's "2026 Landslide Repairs Part 1" at $1,198,430.
28 projects, including $20M and $49M plant expansions and a new Newtonsville plant. No plant project at Nine Mile Creek, and its $3.1M repair line from 2025 is gone.
Clermont County: 1 sewer loan request on Ohio EPA's 2026 list, 1 of them repairs
Of $100,000 in requested state sewer loans on Ohio EPA's 2026 intended projects list, $100,000 is for repairs, $0 for new or expanded capacity and $0 for projects whose names don't say which. The largest is Clermont County Health Dist's "2026 Septic Rehabilitation Program HSTS" at $100,000.
Clermont County: 0 of 1 sewer bills and 0 of 2 water bills rose from 2022 to 2023
At the survey's standard household use of 4,000 gallons a month, the one sewer bill reported was $357 a year (New Richmond); water bills ran from $223 a year (New Richmond) to $378 (Clermont). Comparing the same systems in the 2022 survey, bills went up for 0 of 1 sewer systems and 0 of 2 water systems.
Consent order in case 88 CV 0256: violations at Middle East Fork, Lower East Fork, O'Bannon and Nine Mile, overflows at 12 lift stations, a $100,000 penalty.
Sewer plants
From EPA's own records
15 active sewage plants with permits (12 public, 3 private).
15 broke their permits at some point in the last three years.
4 in significant noncompliance right now.